Clear scope. Checked quantities. Better-prepared building decisions.Explore the global TB platform
PRACTICAL GUIDES

Understand the work.
Review the supply.

Worked examples for alteration slab quantities, tile procurement and site-access or freight quote inclusions.

START WITH THE BASIS

Three checks before a figure becomes a commitment.

Guides
RESIDENTIAL ALTERATIONS & CONCRETE

Separate the new slab quantity from the existing-work assumptions.

A measured volume is one part of an alteration estimate. Keep the interfaces and exclusions visible.

Read the guide
RENOVATION FINISHES & PROCUREMENT

Make the tile order follow the finish schedule.

Work from measured surfaces, then review allowance, whole boxes and the actual product.

Read the guide
SUPPLY QUOTES & SITE ACCESS

A delivered rate needs a site, not just a postcode.

Review freight, receiving, unloading and handling responsibilities before treating a quote as an installed cost.

Read the guide
PUT IT INTO PRACTICE

See how one input changes the result.

Inspect geometric volume, whole-block counts and tile-box rounding. The demos show the formula and let you edit the example rate.

Open a TB sample estimate
BUILD THE BASIS BEFORE THE COMMITMENT

Give your next alteration or building estimate a clear starting point.

Explore measured quantities, editable rates and resource planning in TrendyBuilders. Choose the capacity that suits your estimating work.

Know the basis before the next step.See plans