Define the alteration
Record the work boundary, drawing revision and existing-condition assumptions.
A practical workflow for reviewing measured work, alteration assumptions and quoted supply conditions.
For a residential alteration, identify new work, retained construction, demolition, preparation and making good. Record the drawing revision and the information used for measurement. Keep unresolved existing conditions marked for review.
A planning allowance should not obscure a known omission or substitute for investigation. Show the measured quantity and the assumption separately so the next person can see what the total depends on.
Apply the same clarity to building packages. Concrete, masonry, floor finishes and resource scenarios need explicit units and scope before prices are added.
Open a TB sample estimateRecord the work boundary, drawing revision and existing-condition assumptions.
Keep dimensions, units, deductions and allowance visible.
Confirm the product, packaging, freight and site-access basis.
Separate measured work, purchase quantities and installed cost.
Slab area in m² needs thickness before becoming concrete volume in m³. A tile area needs the selected box coverage before becoming a purchase quantity. A block count needs a verified nominal module.
Confirm freight, delivery point, unloading, handling, access, storage and work sequence against the actual project. Keep labour and equipment assumptions visible. Do not assume a delivered material quote is an installed cost.
These tools support quantities and planning. They do not establish design suitability, approval or compliance. Review the approved project documents, specifications and applicable requirements with the responsible professionals.
Explore measured quantities, editable rates and resource planning in TrendyBuilders. Choose the capacity that suits your estimating work.