Define the work
Separate new construction, retained work, removal and making good. Keep the current drawing and measurement basis visible.
Prepare building and residential alteration estimates with visible metric quantities, editable NZD examples and clear supply assumptions.
Metric quantities · Editable rates · Purchase planning · Print-ready reports
EDITORIAL IMAGE · BUILDING IN NEW ZEALAND10 m × 8 m × 0.15 m + 5%
New work, existing-condition assumptions and a supplier’s service boundary should not disappear inside one total.
Separate new construction, retained work, removal and making good. Keep the current drawing and measurement basis visible.
Use explicit units, dimensions and deductions. Review allowance and package rounding as separate decisions.
Match each rate to the product, location, freight and included services before it enters the estimate.
Three browser-local demos with metric quantities and editable NZD example rates. No account needed.
Adjust the dimensions, allowance and example rate. Review the formula behind the result.
This demo runs in your browser. Inputs are not saved or automatically transferred into a TB project.
A material subtotal, a purchase quantity and an installed work price are different parts of the same decision. Show the boundary before comparing totals.
A practical sequence for scope, measurement, supply and explanation.
Record the work boundary, drawing revision and existing-condition assumptions.
Keep dimensions, units, deductions and allowance visible.
Confirm the product, packaging, freight and site-access basis.
Separate measured work, purchase quantities and installed cost.
A measured volume is one part of an alteration estimate. Keep the interfaces and exclusions visible.
Read the guideWork from measured surfaces, then review allowance, whole boxes and the actual product.
Read the guideReview freight, receiving, unloading and handling responsibilities before treating a quote as an installed cost.
Read the guideChoose an individual workspace or greater capacity for a connected team.
A personal workspace for your estimating work.
A connected workflow for an estimating team.
More capacity for a larger operation.
Subscription prices are stated in USD on the main TB platform. Review current prices, working capacity, billing period, automatic renewal terms and final checkout total before subscribing. NZD figures here are illustrative construction-material examples.
It introduces TB’s construction quantity calculations, material purchase planning, editable cost estimates and resource scenarios using metric dimensions and illustrative NZD examples. The local guides focus on residential alterations, material purchases and quote boundaries.
No. All demo rates are explanatory inputs, not market averages or quotations. Replace them with dated offers for the actual product, location, quantity and supply conditions.
Record what has been measured or confirmed, distinguish it from assumptions, and mark unresolved scope for review with the responsible project team. Do not present an allowance as proof that hidden conditions have been investigated.
No. It covers rectangular volume, a planning allowance and a concrete material rate. Reinforcement, formwork, labour, pumping, testing, equipment, freight and tax need separate review.
Explore measured quantities, editable rates and resource planning in TrendyBuilders. Choose the capacity that suits your estimating work.