SUPPLY QUOTES & SITE ACCESS

A delivered rate needs a site, not just a postcode.

Review freight, receiving, unloading and handling responsibilities before treating a quote as an installed cost.

TrendyBuilders editorial team · Reviewed 29 November 2026 · Worked examples

A material quote can be precise about a product and incomplete about how it reaches the workface. For a residential alteration or building package, review the supply boundary alongside the quantity. Collection, delivered-to-site and installed rates may cover different services.

Record the quote context

Keep product specification, unit, currency, supplier reference, date and validity together. Identify minimum order and delivery location. Retain the written quotation so the rate can be checked again when the quantity or programme changes.

Confirm the access assumptions

Ask about the actual receiving location, vehicle access, unloading responsibility, handling route, storage and timing. Limited space, an occupied property or a constrained work area should be reviewed as project conditions, not absorbed silently into a material rate.

Distinguish freight from site handling

Confirm whether freight stops at a stated delivery point and whether unloading or moving materials beyond it is included. A supplier’s delivery provision should not be assumed to include every site operation. Record separate equipment or labour needs only after checking the quote boundary.

Use the actual location and order

A quotation for one Auckland, Wellington, Christchurch or regional project is not a New Zealand-wide rate schedule. Confirm arrangements for the actual address, order size and supply sequence. Any quoted lead time or availability remains subject to the supplier’s stated conditions.

Keep the cost comparison equivalent

Normalise package units and included services before comparing offers. Record whether GST and other stated charges are included or excluded, and resolve uncertainty with the supplier or responsible adviser. Avoid counting freight, equipment or an allowance twice.

A reviewable estimate: label pending information and keep a dated record of the assumption used. TB supports editable rates and resource scenarios; it does not confirm stock, place a purchase order or supply a commercial New Zealand price database.
BUILD THE BASIS BEFORE THE COMMITMENT

Give your next alteration or building estimate a clear starting point.

Explore measured quantities, editable rates and resource planning in TrendyBuilders. Choose the capacity that suits your estimating work.

Know the basis before the next step.See plans